Low-code,
built by engineers.
We build custom business apps on Microsoft Power Platform — canvas, model-driven and Power Pages — wired into your Microsoft 365, Dynamics and data. Fast where low-code fits, real code where it doesn’t. Senior teams, fixed scope, apps you can actually maintain.
180+ teams shipping with our engineers · ISO 27001-secure · NDA on request
Power Apps canvas app mockup — expense approvals
Expense Approvals
Canvas app · live
Client travel — Mumbai
Ravi Kumar · Sales
Software licences
Sara Naik · Engineering
Team offsite — catering
Amit Mehta · Ops
— What we build
Four app types, one delivery team.
From a single canvas app to a model-driven system on Dataverse, we build the app — and the integrations, governance and source control that keep it alive after launch.
Canvas apps
Pixel-controlled apps for mobile, tablet and desktop — inspections, field service, approvals, data capture.
Mobile
Offline
Field service
Approvals
Model-driven apps
Data-first apps on Dataverse for structured, role-based business processes at scale.
Dataverse
Role-based
Business process
Dynamics 365
Power Pages portals
External-facing sites for customers, partners and vendors — forms, self-service, secure access.
Partner access
Customer portals
Web Forms
Web Forms
Auth
Legacy app modernization
Move spreadsheets, Access and InfoPath onto Power Platform without losing the business logic.
Access → Power Apps
Excel migration
InfoPath
InfoPath
- Featured · Beyond low-code
Low-code until it ,
stops being the right tool.
Custom connectors
PCF controls
Power Fx
Azure Functions
Dataverse modeling
1
SCOPE
Is Power Apps the right tool? Licensing mapped up front
2
BUILDS
Canvas / model-driven, on governed environments
3
EXTEND
Real code where low-code hits a wall
Outcome
We map your licensing before we build — so the app doesn’t arrive with a surprise per-user bill the day it scales.
14 YEARS · 300+ PRODUCTS
Built to ship,
and to maintain.
19+
Custom Model shipped
Across 9 industries
14yrs
Years in business
Founded 2012
95%
Clients renew
aAter the first contract
ISO
Audited
Data security
Capabilities & stack
Boring tech that
ships on time.
We build on the Microsoft stack you already pay for — and extend it with Azure and real code when the job needs it. No plugins you can’t maintain, no shadow IT.
How we pick
01
Right tool first
The most useful thing we do some weeks is talk you out of Power Apps. Low-code isn’t always the answer, and we’ll say when a custom app wins.
02
Licensing before build
We map per-app vs per-user cost up front, so scale doesn’t blindside your budget six months in.
03
Governed, not shadow IT
Proper environments, solutions and source control — apps you can hand to the next team without a rebuild.
04
Extend with real code
Custom connectors, PCF controls and Azure Functions when low-code hits its limit. No fragile workarounds.
Model-driven
Power Pages
Canvas apps
Power Automate
Power BI
Copilot Studio
DATA & DATAVERSE
Dataverse
SharePoint
SQL Server
Azure SQL
Excel
Microsoft Fabric
INTEGRATION
Microsoft 365
Dynamics 365
Custom connectors
PCF controls
Azure Functions
.NET
DLP policies
CoE toolkit
Industries
Apps, tuned for
your industry.
Healthcare
HIPAA-aware apps for clinical and admin teams.
- Patient intake and rounding apps
- Inspections and compliance checklists
- Referral tracking and scheduling
Finance & Fintech
Apps where every approval needs an audit trail.
- Expense and approval apps with policy rules
- KYC / onboarding forms
- Case and document management
Retail & E-commerce
- Inventory and stock-count apps
- Returns and task management
- Field merchandising and audits
Logistics
Apps where a clipboard still runs the warehouse.
- Warehouse scanning and inventory
- Fleet and inspection apps
- Proof-of-delivery capture
Engagement models
Pick how you want to
ship with us.
Three ways in — all senior teams, all fixed against the outcome we agree before the first screen.
Proof of concept
Project-based build
Best for a specific bot with a clear brief.
- Fixed price, 2–4 weeks
- One app, your real data
- A working build + a licensing and scale plan
Most popular
Fixed-scope build
Most popular Best for a defined app with a clear process.
- Scope → deploy in 4–10 weeks
- Fixed scope, fixed price — no hourly drift
- Governed environments, source control, docs
- Handover your team can actually maintain
Embedded
Staff augmentation
Plug senior Power Platform and full-stack engineers into your team.
- 8+ yr average, hand-picked, never on a bench
- Power Apps plus the code skills for when it hits a wall
- Direct line to your IT or ops lead
FAQ
The questions
everyone asks before kickoff.
Not sure Power Apps is the right call? Book a 30-min call with a senior engineer.
When should we use Power Apps instead of a custom-built app?
Power Apps wins when the app is internal, form- and workflow-driven, and lives inside your Microsoft stack — you get it in weeks, not months. A custom app wins when you need a consumer-scale audience, heavy compute, complex logic or pixel-perfect control. We’ll tell you which one fits on the first call, not after you’ve paid for the wrong one.
What can you build with Power Apps?
Both — we benchmark on your task in week one. Closed-source where ROI and latency win; open-weights (Llama, Mistral, Qwen) where you need on-prem, lower per-call cost or fine-tuning. Provider-agnostic abstractions keep you swap-ready either way.
What does Power Apps development cost — and what about licensing?
The build is priced by scope, not by the hour — a fixed number before we start. Licensing is separate and easy to get wrong: per-app and per-user plans price very differently at scale, and premium connectors and Dataverse add cost. We map your licensing during scoping so the running cost is clear before you commit, not a surprise later.
Can you connect Power Apps to our existing systems?
Yes — that’s the default. We integrate with your CRM, helpdesk, ERP, data warehouse and custom APIs through a tool layer with auth, rate limits and audit logging. Read-only on day one; write-actions gated behind explicit human approval until guardrails are proven.
Can you move our spreadsheets or Access apps into Power Apps?
That’s one of the most common jobs we do. We map the logic hiding in your spreadsheets or legacy Access app, rebuild it properly on Power Platform, and migrate the data — so you keep the process and lose the fragility.
What happens when Power Apps can't do something?
We write code. As a full-stack team, we extend Power Apps with custom connectors, PCF controls, Power Fx and Azure Functions when low-code hits its limit — so a platform boundary doesn’t become your problem.
Who owns the app, and can our team maintain it?
Yes — we build channel-agnostic by default. The same conversation engine powers web embeds, WhatsApp Cloud API, voice via Twilio/Vonage, Slack and Teams. Channel-specific UX (quick replies, voice latency, file uploads) is handled per surface.
Is it secure and compliant?
We’re ISO 9001:2015 and ISO 27001:2018 certified, audited annually — NDA-friendly and DPA-ready. We build with managed environments, role-based access and DLP policies, and keep sensitive data inside your Microsoft 365 and Azure tenant.
ISO 27001-secure · Certified since 2020
Let's build the app worth worth shipping.
Send your brief — a senior engineer (not a sales rep) replies within 24 hours with the right-tool call, a licensing read and a fixed-scope plan.
- A 30-min scoping call with a senior engineer
- A right-tool recommendation — Power Apps or custom
- A licensing map so the cost holds at scale
- A fixed-scope plan + reference architecture — yours to keep
- Two case studies from your industry